American Sign Museum

This project was a first phase of a two-phase project for the American Sign Museum expansion into unused space of the museum. This phase incorporated an electrical system upgrade. This upgrade allowed for the second phase of the project to have adequate power. Marque Engineering provided MEP design for Phase 1 of the project which was a multi-level office renovation for the museum. This incorporated new HVAC systems as well as lighting, power and plumbing for the office area.