Hilton Airport Renovation

This project entailed a large-scale renovation of the existing first floor including relocating the main hotel entrance and check in area, renovating the dining facilities, first floor meeting areas, restrooms, and main lobby. Marque Engineering provided full MEP engineering which included all new plumbing fixtures for the restroom renovation, utilization of the existing HVAC equipment, and reconfiguration of existing ductwork to incorporate new air devices throughout and all new power and lighting for this first floor renovation.